Donate a Bag of Sugar!

March 31, 2011

I just launched my first ever Kickstarter project to gather 500 lbs. of sugar before my residency at VCCA begins in 4 weeks. Check it out to donate today! Pledge drives through Kickstarter are all or nothing, so I have to reach my $750 goal before midnight on April 25 or I won’t receive any funds at all, and that means no sugar during my 5 week residency. So I am relying on you guys, my faithful blog followers, online fans, colleagues, friends and family to get this pledge drive rolling. Check out the project description and donate today!

Screenshot of my Kickstarter project

This show was the first time I wrote my own press release and sent it out to every local contact I could think of/find. And who knew that sometimes people actually pay attention to them! I did it mostly as a formality, and maybe as practice, but didn’t expect it to actually lead to anything. For the most part, I don’t think people have actually gotten up to go see the show themselves, but they’ve at least posted the information in their papers and on their websites, or called me for a quick little write-up. And at the very least, it got Anahi Costa, of ArtseenVT to come check it out and write up a review. Not to mention it was great to finally meet her after working with her on Studio Center advertising… Science is Fiction is up for 2 1/2 more weeks so there’s still time, but I wanted to go ahead and share some of the fun publicity I’ve received so far.

Vermont Art Zine, online VT arts magazine–published back when I first sent out the press release

Seven Days, Vermont’s free newspaper–just published yesterday

ArtseenVT, online arts magazine–published this morning

I also got a great write-up in the RISD Alum magazine (pg. 13 and pg. 26 & 27) that happened to coincide with the launch of their new website, so the article ended up on the front page of the alumni section of the new site in addition to in print in the magazine! Had nothing to do with the press releases–just lucky timing.

And I’ve been trying to find some time to write a “Things Learned” entry after the Brooklyn Art Fair fiasco (before I forget everything!), but just to give you a sense of it, I found this article today, which is pretty accurate to my experience. Let’s just say I’m glad I’m not the only one who thought it was a catastrophe.

Two Crazy Weeks

March 15, 2011

I’ve been wanting to write all week and not been able to squeeze in a spare moment to get anything together! The past couple weeks have been completely out of control, between remaking panels from sweet senescence, installing in Brooklyn, flying to Chicago and back, deinstalling in Dumbo, and then installing my Science is Fiction here in Vermont, I have had no time for sleep, much less writing. All I can say is I am so happy to finally have some breathing room. Without getting into all the gory details, everything in Brooklyn was basically a disaster, everything in Chicago was great, and everything in Vermont was stressful and painful but with an end result I think I am happy with. Later in the week I will write a thorough Things Learned entry about my experience in Brooklyn to flesh out more of why things went so badly and how to avoid a repeat in the future. Just to give you some insight into what the last couple of weeks was like, here was my schedule, but first, a few quick shots of the show:

An overview panoramic of the show

half with video projection

View from the specimen table

View from Dura Mater

Sugar bag installation and year old hard candy pieces

Feb 26 & 27: re making sweet senescence panels in 36 consecutive hours (with a 2 hr. nap)
Feb 28: work in office, build frames to transport panels
Mar 1: work in office, pack tools for install, package small samples to take on plane to Chicago
Mar 2: load friends car at crack of dawn, load into rental car in Burlington, drive direct to Dumbo, install panels, eat first meal of day around 9pm
Mar 3: visit Scope Art Fair and other galleries in the city, return to Brooklyn for opening night party but end up missing the event
Mar 4: visit Pool Art Fair, head to La Guardia for flight to Chicago
Mar 5: spend day at SAIC in Fiber and Material Studies department interviews, hang out with grad students and friends
Mar 6: fly back to NYC early, make way back to Brooklyn to pack rental and head to Dumbo for deinstall in pouring rain, eat first meal of day around 10pm, consider driving back to Vermont overnight but don’t because of blizzard
Mar 7: wake up sick but still leave at crack of dawn to drive back to Vermont, hit blizzard despite trying to miss it, collapse at Studio Center, amazed to have survived the drive
Mar 8: return rental car early in Burlington, work in office, begin gathering work for solo show and moving from studio to gallery
Mar 9: work in office, leave early to continue moving work from studio to gallery, install show for next 24 hrs with 2 hr. nap
Mar 10: work in office, so sick not sure will make it to opening that night, leave early to finish show install, attend opening in high spirits, crash early
Mar 11: work in office, then let the relaxing begin!

Because of the incredibly tight schedule, I didn’t get to resolve all the pieces that I wanted to include in the show, so I am still hoping to wrap up a couple more objects to add. Then it will be time to concentrate on purging, packing and preparing for both my move and the residency in Virginia. I am happy to report that time is flying by!

%d bloggers like this: